AI in the Chain

Navigating the Future of Supply Chains with AI


When Digital Networks Go Down, What Can Supply Chains Still Do?

On 12–13 November 2026, a Microsoft 365 incident disrupted access to Exchange Online mailboxes and delayed email delivery for many users. Microsoft’s published incident timeline spans nearly 24 hours. In October, a separate disruption affected several Google Cloud services in its London region. Both episodes raise a practical question for supply chain leaders. Which orders, shipments and approvals can still move while IT works on recovery?

Now imagine the ERP is unavailable at the start of your shipping day. The supplier portal is down too. The warehouse has stock on the floor, a truck is due at the dock and a customer is waiting for tomorrow’s delivery. Halfway through the morning, a supplier calls to say a component will be late. IT is investigating. What can your team actually do?

A company can keep selected activities moving without its ERP for a limited time, at reduced capacity, when the fallback has been designed and tested. Teams can usually triage orders, confirm facts and update customers if they can reach the right people and records. In some operations, they can also pick, pack and dispatch a small set of previously approved orders. Where teams cannot verify inventory, maintain traceability or complete a required release, the affected activity has to pause. A business continuity plan (BCP) should make those boundaries explicit before the outage. It should also cover the reverse situation: ERP is available, but the messages that trigger work never arrive.

1. Start with incidents and near misses

Build the BCP around what has actually happened. Ask customer service, buyers, warehouse teams, IT and critical partners to bring recent incidents and near misses. Include technology failures and cyber incidents. Capture what failed, how long it lasted, who was affected, which workarounds people used and what delayed recovery. A carrier confirmation caught just before cutoff belongs on the list even if the shipment left on time.

Turn each episode into a scenario, then vary the conditions. If a partner’s email was intermittent for a few hours, test what would happen if both sides lost email for more than a day. Use incident history to identify plausible failure modes and dependencies.

2. Map the dependencies behind each scenario

Start with an outcome the business needs to protect, such as dispatching priority orders before the daily carrier cutoff. Follow the work from order release to warehouse execution, carrier handover and customer notification. Identify where ERP, the warehouse management system, transport booking, electronic data interchange, identity services and local connectivity enter the workflow. Then ask which dependencies sit outside your company.

For critical Tier 1 partners, such as logistics providers and contract manufacturers, ask what happens if their systems go down and which underlying platforms their fallback still needs. Follow Tier 2 dependencies where their failure could stop a critical flow. Two logistics providers may rely on the same booking platform. A fallback worklist stored behind the same login service may be unreachable at exactly the moment it is needed. For each critical dependency, ask what a 12-hour outage would interrupt, when the impact would first become unacceptable, and who can activate an alternative.

Use those findings in supplier reviews. Procurement and IT security can agree proportionate requirements for access controls, incident notification, escalation contacts and recovery commitments. Ask critical partners to demonstrate their fallback in an exercise. A service-level agreement can define how quickly a partner should respond. A joint test shows whether the warehouse can still get a booking and record the handover.

3. Assess when the interruption becomes material

We’ve seen this in practice. Our own email was available, yet messages from some partners using Microsoft email services did not reach us. A buyer can have a working inbox and still miss a supplier’s revised delivery date. A warehouse can be ready to ship and never see the carrier’s pickup confirmation. The first sign of disruption may be a missed handoff, hours before anyone knows whether email is the cause.

Work back from the deadlines that matter. Four hours without email might be enough to miss a same-day pickup. After 24 hours, teams may have several unconfirmed order changes and a shift handover to manage. After 72 hours, unanswered requests and transactions handled through alternate channels may exceed the team’s capacity. These are exercise checkpoints. Set activation triggers using actual cutoffs, staffing and customer commitments.

Use one record per scenario so people can find the decision and the fallback quickly.

FieldExample for email unavailable for more than 24 hours
Disruption and evidenceBased on a missed partner handoff. The exercise extends the interruption beyond one day.
Affected processes and partiesPurchase orders, changes and pickup confirmations involving buyers, customer service, the warehouse and partners.
Impact by durationAt 4 hours, pickup cutoff at risk. At 24 hours, unconfirmed changes accumulate. At 72 hours, check whether alternate channels and staffing can handle the backlog.
DependenciesVerified contact list, order records, approval history, devices and sign-in or verification services.
Workaround and triggerLogistics calls the carrier if confirmation is missing at the agreed checkpoint. Use the approved alternate channel for written instructions.
Owner and recovery targetLogistics owns the pickup decision. Agree when confirmation must be available and ask IT to prioritise restoring access to dispatch messages.
ValidationWithhold a confirmation, verify the alternate handoff, then deliver the original message during recovery and check for duplicates.

4. Set recovery priorities and decision rights

Agree which work must continue, who can activate the BCP and who may authorise a workaround. Give IT the business deadlines that should inform restoration priorities. Agree what a shift lead can approve locally and what must go to the incident lead, finance or compliance. Then document what each team can do under the conditions it actually faces.

ActivityWhat can continue in fallback modeWhen to pause
Order intake and customer updatesLog incoming orders with unique references, acknowledge receipt and give customers a time for the next update.A firm promise needs verified availability, timing and approval.
Warehouse and dispatchWork from a controlled list of already released orders if the team can verify stock and allocations, capture required serial or lot data, and produce documents the carrier and receiver accept.Hold shipments when a mandatory quality, trade compliance or traceability check cannot be completed.
Procurement and productionConfirm supplier status through known contacts and continue selected released work where instructions, materials and quality records remain available.Hold new commitments or affected production steps if the team cannot apply the required controls or record what was used.
Billing and paymentsRecord dispatch evidence for later billing. Treasury can use a tested secondary payment route for approved critical payments if verification and dual approval remain available.Defer invoicing or payments when supporting records, approvals or duplicate checks are unavailable.

Each site should define its own limits. A warehouse whose local system remains available may be able to complete picks already released before the outage. A site that loses its scanners, label printing or access to shipment records may be able to stage goods and stop there. Put a volume or time limit on each fallback, and identify who can extend it. Manual work creates a backlog of transactions that must eventually be checked and posted.

5. Write the fallback and agree it with partners

For each critical handoff, define what should arrive, who checks for it and when silence should trigger a call. If the carrier normally confirms a pickup by 10 a.m., assign someone to call the carrier at 10 a.m. using a verified number if the confirmation is missing. Apply the same rule to urgent purchase orders, supplier acknowledgments, dispatch instructions and customer updates. Choose the trigger by working back from the operational cutoff, while there is still time to act.

Agree the backup channels with critical partners before an incident. A known phone number works for checking status and escalating an exception. A tested portal or another approved secure channel can carry orders, documents or approvals when the process requires a written record. Check that the alternative works without the affected mailbox, shared login or email-based verification. Keep the contact list and escalation rules accessible when email and the usual collaboration tools are unavailable.

Ask the recipient to confirm receipt and repeat back the critical details, such as the order number, quantity or pickup time. Log the channel, timestamp and agreed action. When email recovers, match delayed messages to the outage log before processing them. A purchase order entered through the fallback channel could arrive again by email the next morning. Keep the order reference consistent so the team can recognise the duplicate.

Keep short templates for order changes, pickup confirmations and customer updates. Include an order reference, the requested action and the time by which the recipient should respond. Agree an update cadence and who covers each role across shifts. For sensitive approvals, use the established verification and authorisation process.

Prepare an approved fallback pack with a dated order and stock snapshot, contact details, role coverage, priority rules, controlled forms and a transaction log. Make it accessible through a route tested independently of the primary system. Arrange any essential alternatives in advance. For example, confirm that a prequalified carrier can accept the booking and required paperwork through a different channel, or that an alternate ground route can meet the customer’s deadline if the normal air route closes. A second carrier or bank adds resilience only if it can operate through the failure you are planning for.

During the outage, the business incident lead activates the fallback, sets priorities and names the next review time. IT and security establish which systems, devices and data can be trusted and share recovery updates. Warehouse, procurement, finance and customer service execute within agreed limits. Record each action against a unique reference, with the evidence, approval, timestamp and execution status. Keep a record of actions that were requested, approved and executed so the recovery team can tell them apart.

Consider the customer order due tomorrow. Yesterday’s snapshot shows 120 usable units against a requirement of 100. The warehouse verifies that production consumed 40 after the snapshot. That leaves at most 80 units before checking reservations for other customers. The supplier says another 30 might arrive in the morning. Those units become available for a firm promise only when arrival and any receiving or inspection steps can be confirmed against the shipment cutoff. The team can verify what stock is free, explore a partial delivery if the customer accepts it and set a time for the next update. The same arithmetic an AI assistant would normally help assemble can be done by hand. The harder part is obtaining evidence and knowing who has authority to act on it.

Reconcile records before resuming automation

An ERP login working again tells you the system is accessible. The business still needs to establish which transactions are already in the system, which interfaces have queued messages and what happened offline. Compare the outage log with restored ERP and warehouse records, including receipts, stock issues, shipments, allocations, invoices and any payments made through fallback channels. Check for duplicates before posting missing transactions. Ask the process owners to resolve discrepancies and confirm which customer commitments still hold.

Resume automated feeds and AI recommendations for the affected workflow after the relevant owners sign off on the reconciled data. Review any queued actions against the current position. An expedite request raised during the outage may have become unnecessary if the material arrived while the portal was down.

6. Test the plan, fix the gaps and test again

Pick one real order flow and use sample data. In the first 15 minutes, take away access to ERP and the normal collaboration channel. See whether the team can activate the plan, reach the fallback pack and contact the people it needs. Over the next 25 minutes, introduce the supplier delay, the unrecorded stock movement and a carrier cutoff. Ask participants to decide what can continue, show the evidence for a dispatch or a hold, and give the customer an update. Use the final 20 minutes to simulate restoration. Include a shipment message already waiting to replay and ask the team to reconcile the records without posting it twice.

Run a second version with ERP and your own inbox working. Withhold a partner’s pickup confirmation and see whether the team notices by the agreed cutoff, reaches the partner on an independent channel and records the confirmed pickup. Deliver the original email during the recovery step to check that nobody books the shipment twice.

Track time to the first customer update, which checks the team could complete, how many orders it could realistically handle per shift, and which records could be reconciled. Then run a controlled warehouse walkthrough with your logistics partner. Ask someone on the next shift to use the fallback instructions to produce a sample pick list, label and carrier handover record. The tabletop tests decisions. The walkthrough finds practical gaps such as an inaccessible printer, a missing contact or a document the carrier cannot accept.

The next time you review the BCP, take one priority order and ask the team to show how far it can get through a full shift without ERP or without reliable email. Put the first step they cannot complete on the action list, assign an owner and a due date, update the plan, and retest it with the people who will run the process during the outage.

Read next

Subscribe to AI in the Chain for practical ways to test AI and improve supply chain decisions.

References



Leave a Reply